San Francisco Federal Building — Natural Vent Strategies
Motivation / Problem Statement
Lack of design/analysis tools for naturally ventilated large commercial buildings.
Activities / Approach
Use EnergyPlus to select natural ventilation system and inform envelope design, use EnergyPlus and CFD design control strategy, use EnergyPlus to pre-commission control system.
Accomplishments / Outcomes
Identified simple NV system — $1.5M savings; pre-commissioning of controls allowed programming problems to be identified and fixed well before occupancy.
Future / Follow-on
Performance monitoring, model validation?
Relationship to Other Projects
Low Energy Cooling, Building Controls Virtual Test Bed
Principal Investigator
- Philip Haves
- (510) 486-6512
- with
- Peng Xu
- (510) 486-4549
- Dimitri Curtil
- CERC San Diego